Subscribe to RSSTHe Week
1,239 trees to be felled for 9 km Ring Road expansion
Govt formulates first draft of urban poor policy
SC defers hearings against removing difficulties 17 times
Haque's supporters continue protests for 2nd day
Justice delayed
Pockets of prosperity
The hidden side
My Republica e-Paper.
Market
  Forex
  Stocks
 
Phalano by Rajesh KC
Cartoon Archive »  

Archives
  Daily News
  Photo Gallery
Thursday WEATHER
KATHMANDU
Thunderstorms
Low 18oC
High 27oC
Sunrise 5:10 am
Sunset 6:49 pm
 
 
  PM pledges repair of damaged Gandak barrage  
 

RSS

NARSAHI, Nawalparasi, Sept 27: Prime Minister Dr Baburam Bhattarai has said the government was making maximum efforts to complete all repair works of the Gandak barrage damaged due to floods from the Narayani river, before the rainy season, next year.

Addressing the locals following the field inspection of the areas suffered erosion from the floods, the Prime Minister pledged to take elaborate measures to control the flood with cooperation of India as quickly as possible.

As per the Gandak treaty reached between Nepal and India in 1959, all tasks related to barrage construction, erosion control and repairing is the responsibility of the Indian side, said the Prime Minister, adding that the Central Government of India was already requested to this end through the diplomatic channel.

Supervision of all physical infrastructures constructed on Nepali territory to control the flow of river caused by the construction of the Gandak barrage, maintenance of the damaged structures and reconstruction falls upon the responsibility of the Uttar Pradesh State Government, India. The Nepal government is ready to make necessary security arrangement for the maintenance of the barrage, he said.

Similarly, Minister for Physical Planning and Works Hridayesh Tripathi who was accompanying the Prime Minister said the government was utmost serious towards controlling the possible damages caused by the Gandaki river. The Prime Minister was here to feel the pains of the local people given by the Gandak floods, he said.

Floods from the Narayani river recently caused rampant erosion on Spur 12 based in Narsahi VDC-6 posing a threat of inundation in many villages. Over 10,000 people could be displaced from different villages including Narsahi, Paklihawa, Guthi Parsauni and Rampurwa if the river gushed into the area.

 
Published on 2012-09-27 17:26:59
# # [Facebook] [Slashdot] [Digg] [Reddit] [del.icio.us] [Technorati] [Google] [StumbleUpon]

 
 

PLEASE DESIST FROM ATTACKING THE WRITER PERSONALLY AND BE RESPECTFUL TO OTHER READERS.

Please give your full name while posting your comments. This is not to stifle the free flow of comments but your full name will enable us to print the comments in our newspaper.

 

PM Pledges Repair Of Damaged Gandak Barrage
Comment on this news #
Name
Email
Comments
   
543
 
   
 
 
Related News
More on Latest Briefs
About us  |  Contact us  |  Advertise with us  |  Career   |  Terms of use  |  Privacy policy
 
Copyright © Nepal Republic Media Pvt. Ltd. 2008-10.